Note: NEED A DATACENTER ROOM ENGINEER WITH STONRG CABLING EXPERIENCE

L3 Engineer Roles & Responsibilities

Daily Operations• Site data center/computer room operators must keep up with the requests, tasks, deliverables and projects through various forms of communication

o Service Now (SNOW)

§ Operators must continually monitor the associated activities and stay up to date with the variety of tickets and requests• Change request/task• Request ticket• Incident ticket

o Email, MS Teams, Phone

§ These requests must be documented, and no work is to be completed without a proper SNOW ticket, task or request• Site personnel will assist with daily & weekly data tape activities

o Includes: onsite tape deliveries, shipments, recalling tapes, inserting & removing tapes for associated tape libraries/robots

o Complete data restore activities• Update computer room devices/equipment in ServiceNow and DC Ops maintained spreadsheets

o Cabinet elevation drawings

o Cable connection database

o Structured cabling port capacity

Racking Equipment• Responsible for the equipment cabinet assignments within the computer rooms based on requirements (power, space and connectivity)• Racking equipment requests are provided mainly though ServiceNow change tasks or through request tickets

o Racking can also be part of testing equipment, pilot installations or specific projects• Safety must be taken into account when racking equipment

o ll racking should be completed by 2 people (minimum)

o Racking should use the Server Lift, foot crack table lift or other available mechanical device for medium to heavy lifts

o Rails and shelves should be in place first before sliding in the server, switch or other device

o ll servers or associated appliances must have cable management arms installed at the rear

Unracking Equipment• Responsible for the unracking of equipment located within the cabinets and/or racks• Unrack equipment requests are provided mainly though ServiceNow disposal change tasks or through request tickets

o Unracking tasks can also be part of a data center or computer room closure project• Safety must be taken into account when unracking equipment

o ll unracking should be completed by 2 people (minimum)

o Unracking should use the ServerLift, foot crack table lift or other available mechanical device for medium to heavy lifts

o Rails, shelves and cable management arms must be removed as part of the unracking activities• Work with associated disposal groups to assist in the final disposal task when the equipment leaves the site on a truck/van (documentation)

o Work with groups when hard drives, data tapes or other mediums require these items to be destroyed or grinding into pieces (documentation)

Patch Cabling• New Installations

o The majority of the patch cable run specifics will be provided though ServiceNow change tasks or through cabling request tickets

§ These tickets must provide the details required to deliver/run the patch cables (copper/fiber) to the specific servers/devices and network/SAN switches or another device

§ Patch cable runs can also be part of testing equipment, pilot installations or specific projects• dditional connections

o ll additional connections required for existing devices/equipment will be provided though ServiceNow cabling request tickets

§ These tickets must provide the details required to deliver/run the patch cables (copper/fiber) from specific server/device ports to network/SAN switch ports or other device ports

§ Additional patch cable runs can also be part of testing equipment, pilot installations or specific projects• Patch cable cleanup / removals (power cord removal)

o The majority of the patch cable cleanups and removals will come through ServiceNow disposal tickets

§ These tickets provide the details required to unplug and remove the patch cables (copper/fiber) at the server/device ports as well as the network/SAN switch ports or other device ports• The patch cables which were removed will be evaluated and placed back into inventory if the proper copper patch cable category (CAT6A) or fiber patch cable category (SM OS1/2 or MM OM4)

o The remaining patch cables will be thrown away

§ Patch cables must be unplugged and removed before any device can be unrackedPower cords must also be removed as part of the cleanup and/or disposal activitiesThe power cords which were removed will be evaluated and placed back into inventory if they are the standard - P-LOCK 2 color power cords• The remaining power cords will be thrown away§ Power cords must be unplugged and removed before any device can be unracked

Capacity Planning• Structured Cablingo Continuous vigilance into the usage and availability of copper & fiber patch portso New installations should be planned with plenty of time allowed§ Time buffer required for design, present requirements (SOW) to the Low Voltage Contractor (LVC), receive quote, material ordered, installation, testing• Network switch portso Continuous vigilance into the usage and availability of copper & fiber switch portso New switch module or switch orders should be planned with plenty of time allowed (buffer)§ These items must first be specified, then approved by the network architecture group/BT• Time buffer required for approval, items ordered (supply chain delays), planning the installation• Storage Area Network (SAN) switch portso Continuous vigilance into the usage and availability of fiber switch portso New switch module or switch orders should be planned with plenty of time allowed (buffer)§ These items must first be specified, then approved by the storage architecture group• Time buffer required for approval, items ordered (supply chain delays), planning the installation• Cabinet Power usageo Continuous vigilance on the power usage (AMPs) per PDU and per cabinet (both PDUs)o Maintain 80% or less AMPs or kW solely based on the capacity of one PDU§ single PDU should be able to maintain the power for all the equipment in a cabinet

TroubleshootingSite DC Ops personnel must have complete knowledge of:o The cabling distribution within the computer room (point-to-point or structured cabling)o The cabling distribution to/from the computer roomo The switching equipment - network & SAN switcheso The physical connections on every piece of equipment (servers, storage, network, tape library/robot, etc)o Complete basic equipment initial configurations (ILO, IDRAC, console, etc)o Network switch port configurations (port speed, duplex, VLAN, trunking, Etherchannel, tagging, etc)§ Used on BT network switch port configuration requests• Site must have onsite cable testing tools

Cleanliness• ll areas within the computer room must be kept clean and free of cluttero ll spaces (offices, storage rooms) outside the computer room must be kept clean, without clutter and organized• The computer room must have a once a year (minimum) scheduled professional cleaning• The computer room must be clear of paper, cardboard, plastic, garbage, debris or other loose items• Loose items cannot sit on top of any piece of equipment or in any cabineto ll these items must be stored in a storage cabinet (preferably locked) inside the computer room or adjacent room(s)• Bottled drinks including water, soda or other drinks are not allowed in the computer roomsSafetyWorking areas must be identified and outlined with safety conesUnsafe areas must be sectioned off with CAUTION tapeOpen toed shoes are not allowed inside computer room areas (includes visitors)o Safety glasses must be worn when removing raised floor tilesItems & Materials Inventory• An inventory of all the items and materials used in computer room must be kept up to date

Includes: patch cables (copper & fiber), locking power cords (2 colors) and other items and material required to support the computer room's daily activities (see APPENDIX for ordering template)• Each site must maintain cable testing tools on handSpare Parts Inventory• Site must maintain an up-to-date inventory on spare parts on hardo Includes: servers, hard drives, RAM, server cards, etcOnsite Inventory - COD Servers & In-Inventory Servers• Support the site's COD (Capacity on Demand) inventoryThese COD servers will be racked in the cabinets, powered ON, cabled, switch/SAN ports configured, with or without an OS installed• Support and maintain a certain amount of In-Inventory serversThese servers are powered OFF and racked in a cabinet or stacked/stored in the computer room or storage area

The number of servers along with the server Make & Model are specified by IT Hosting• These servers will be used for replacements, new installations and parts• Besides servers, appliances or other devices/equipment may be placed into inventory

Asset Reconciliation•

The computer room physical inventory must align 100% against the CI records in Service Now, and vise versao Two comparisons must be completed§ First - physical inventory against the CI records§ Second - CI records against the physical inventory• All the discrepancies with the physical inventory records or CI records must be identified, investigated and reconciled, remediated and correctedUltimately, the physical inventory must match the Service Now CI records across all fieldsOn-Call schedule• Each site must have a hierarchal or rotating on-call list/schedule to cover after hours or weekend incidents when they surfaceAccess• Only individuals with permanent badge access are permitted in the computer rooms without a request or without an escortAll vendors/visitors must be escorted into the computer rooms (no exceptions)• Temporary access can be granted through the datacenteraccess.Client.com website (new version to be operational soon)

Projects / Future Work• DC Ops will work alongside various groups and people assisting them in planning out future work and/or activities

Knowledge• Network connectivity throughout the computer rooms• SAN connectivity throughout the computer rooms• Structured cabling distribution• Patch cable labeling procedures• Proper patch cable routing, bundling, neatness• Troubleshooting all connectivity issues• Use of patch cable testers (LAN, copper & fiber)• IP addressing• Network switch port configurations• Server ILO, IDRAC port configuration• ServiceNow CMDB modules• Power distribution at the cabinet level• Computer room support systems (CRAC, UPS, Generator, Fire Suppression, etc)• Capacity planning on all connectivity/power aspects where availability is critical• Particle counter readings