Electrician - Lead / Foreman (Data Center construction)
Helix Electric, Phoenix, AZ, United States
Description
Helix Electric was founded in 1985 and is now one of the nation's largest and most successful electrical contracting companies. Our commitment to empowering people and powering projects is realized by our exceptional team of dedicated and highly skilled experts working together and never settling for good enough. We are proud of the team-oriented and employee-empowered business approach that defines our unique character.
Helix Electric has need for Leadman and Foreman Electricians. The successful candidate will lead a team of electricians and will be part of a production driven team, performing electrical installations and troubleshooting.
DUTIES & SCOPE:
- Must have proven experience as a lead electrician capable of supervising a crew of 10 - 35.
- Responsible for assembly, installation, maintenance and testing of electrical equipment and wiring systems in commercial settings.
- Prepares work area for installation of equipment.
- Installs electrical components.
- Connects wiring and equipment as per code and job specification.
- Operates equipment only if trained and certified to operate. (Note: Powder activated tools, and JLG lifts and other operations that may require certification and training before operating).
- Sets up and operates tools such as hydraulic benders, power threaders, power pullers and cable vacuum systems.
- Be able to read blueprints and electrical drawings and install as specified.
- Verify dimensions, alignments and clearances per drawings or plans.
- Secure and lock up equipment after use.
- State Journeyman Electrician Certification is a requirement in states where required or considered highly desirable in states without this requirement
- A proven track record of delivering safe projects on schedule and within budget.
- Excellent working knowledge of the Building Codes.
- Strong communication and interpersonal skills.
PHYSICAL DEMANDS:
- Job requires working in all elements, depending on job location, time of year, heat, cold, rain, snow.
- Wear personal protective equipment (hard hat, safety glasses, and gloves always), respirator when required.
- Able to work 8-10 hours per day, 40+ hours per week, plus overtime.
- Must be able to perform the essential functions of the job, including crawling, standing, stooping, bending, crouching, kneeling, sitting, reaching, able to routinely lift heavy objects in excess of 50 pounds and pushing and pulling of objects is required.
- Repetitive use of arms, hands, and fingers.
- Physical work is a primary part (more than 70%) of the job.
The starting hourly base pay for this role will vary. The actual base pay is dependent upon many factors, such as: location, training, transferable skills, work experience, business needs and market demands. The base pay range is always subject to change and may be modified in the future. Helix Electric provides a comprehensive benefits package that includes the following:
- Medical Plans
- Dental Plans
- Vision Plan
- Life Insurance
- Disability Insurance
- Accident Insurance
- Critical Illness Insurance
- Hospital Insurance
- Pet insurance
- 401(k) Plan with Match
- Employee Discount Program through PerkSpot
- Tax Savings Accounts - FSA, HSA, DCFSA and CSA
- Tuition Reimbursement
- Scholarships
Equal Opportunity Employer/Protected Veterans/Individuals with Disabilities
The contractor will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information. 41 CFR 60-1.35(c)